Industrial Building Evaluation

Client  |  Private Client
Project Location  |  Boston, MA
Date of Completion |  May 2016
Project Size  |  100,000 s.f. (2 Buildings)
Budget  |  $4.5 million

The Challenge: Two industrial buildings unoccupied for decades, suffered from long term deferred maintenance resulting in significant deterioration of the historic buildings.

Project Scope:

  • Wessling Architects performed a thorough hands-on investigation and documentation of the ongoing deterioration.

  • Study included coordination with structural engineers on areas of structural concern.

  • Historic structures report included careful documentation of existing conditions, recommendations for appropriate restoration of the building fabric, and detailed budgets for restoration.