Softbank Robotics  |  Interiors

Client  |  Hold Thyssen
Project Location  |  Boston, MA
Project Size  |  6,073 s.f.
Date of Completion  |  2018

The Challenge: Special attention was required in coordinating the selection and transitioning of new flooring materials over the existing substrate of 3/4" plywood over plank on timber. 

Project Scope:

  • Interior alterations to provide new glass front offices and conference rooms, open office work area, breakroom, robot storage and repair areas.

  • New loading dock access with epoxy flooring to support moderate fork lift traffic.


 

Photography © Gregg Shupe 2018 | Shupe Studios